TECHNOLOGY EXPLORER

A definition before a comparison.

Selected educational profiles. Scale and source stage are separate dimensions, not a ranking.

ProfileScale labelEvidence stageWhat to keep in view
AP1000Pressurised-water reactorLargeOperating examplesEstablished design with operating projects; a new site still needs its own approvals.
BWRX-300 — DarlingtonBoiling-water SMRModularConstructionThe Canadian regulator records one unit under construction. Operating permission is a separate step.
AP300 — US engagementPressurised-water SMRModularDevelopment / reviewThe US NRC describes pre-application engagement for a future design-certification application.
EPR — Flamanville examplePressurised-water reactorLargeDated grid milestoneFirst grid connection reported on 21 December 2024. This is a dated milestone, not a current availability claim.
EPR2 programmeNew-build programmeLargeDevelopment / reviewEDF describes its EPR2 programme. Programme plans do not establish operation at a proposed site.
NUWARD platformDeveloping electricity and heat platformModularDevelopment / reviewVendor terminology and configuration are evolving. Verify current project and licensing evidence.

These six examples are not a technology shortlist or a database of approved designs. Stage labels refer to the cited context, not every project using that name. “Modular” follows vendor terminology; not every marketed SMR platform uses the same module definition.

Sources: W-AP1000 · CNSC-DNNP · NRC-AP300 · EDF-GRID · EDF-NEW · NUWARD. Checked 9 November 2026. Full context in Sources.